Reunion (Indian Ocean)


01/01/2016

Viaduc de la Nouvelle Route du Littoral (NRL)

HydroConsult after being contracted by Vinci as consultant to support them in the chose of the equipment for the positioning of the barge Zourite and the bridge Pile now supply them all the Surveyor for the positioning and the dredging control.